[email protected] (+34) 952 476 867

Mónica Building

WORK: Mónica Building. 2007
ADDRESS: Paseo Marítimo Fuengirola
ADMINISTRATION: Rodrigo Jodar Administraciones

 

Procedure:

 

Rehabilitation of the building with the following procedure: Pickling of the coating with pressurized water machine of the vertical and horizontal faces of the Monica Building located in Fuengirola. Masonry restoration. Later application of fixative of anchorage. And final application of two layers of the coating.

SEE PDF PROCESS OF WORKS