Building Noria 3

WORK: Noria Building 3. 2005
ADDRESS: Fuengirola
ADMINISTRATION: Maria Rosa Gutierrez

 

Procedure:

 

Rehabilitation of the building with the following procedure: Pickling of the coating with pressurized water machine of the vertical and horizontal faces of the Noria 3 Building located in Fuengirola. Restoration of masonry. Later application of fixative of anchorage. And final application of two layers of the coating.

SEE PDF PROCESS OF WORKS