[email protected] (+34) 952 476 867

Astigi Building Phase 1

WORK: Astigi Building phase 1. 2013
ADDRESS: Fuengirola
ADMINISTRATION: Iglesias administraciones

 

Procedure:

 

Repair and protection of the concrete slabs of the Astigi Phase 1 building in Fuengirola (Málaga):

– Installation of bimastil scaffolding.
– Pickling with water projection of 300 bars of pressure.
– Demolition of unstable faces
– Treatment of sikamonotop 910 concrete reinforcement
– Application of structural repair mortar R4 sikamonotop 412
– Demolition of terraces and formation of slopes with mortar
– Waterproofing of terraces with sikalastic system of liquid polyurethane membrane continuous and adhered to support.
– Installation of non-slip flooring
– Application of fixative of anchorage, on vertical and horizontal paraments.
– Application of coating on vertical and horizontal walls.
– Installation of aluminium handrails and sealing with polyurethane foam to prevent water from entering the interior of the floors.
– Formation of concrete slabs to join terraces