[email protected] (+34) 952 476 867

Mónica Building

WORK: Mónica Building. 2015
ADDRESS: Paseo Marítimo de Fuengirola
ADMINISTRATION: Rodrigo Jodar Administraciones

Mónica Building

 

Procedure:

 

Restoration and painting of the Monica building located on the Paseo Marítimo in Fuengirola, firstly stripping with a 300 bar three-phase pressure washer the antique coating of the vertical and horizontal faces of the building. Demolition of the forged fronts of the terraces. Cleaning of the rust of the concrete reinforcement. Given the serious state of degradation of the floors of the building as a whole, SIKA MONOTOP 910 was chosen as an anti-corrosion treatment for the reinforcement of the concrete and as a bonding bridge. Subsequent application of SIKA MONOTOP 412 S which is a repair mortar R4. Application of SIKA HYFLEX 250 FACADE in expansion joints. Application of SIKA FILLER 123 fibres on small micro fissures and shrinkage fissures of the initial mortar. Application of fixative of anchorage and two layers of smooth coating that provides to the facing a protection of the external atmospheric agents.